Hook into a row steel fiber machine

Installation and debugging: Within 3 working days after the contract is signed, the seller must provide foundation engineering and construction technical materials and construction drawings such as pipelines (including electrical, cooling water, compressed air) and other construction. After the equipment arrives, the seller sent people to the site to guide the installation and debugging to ensure that the equipment is put into production smoothly.

< 1 >
Hongshengyuan (Shanghai) Metal materials

Apply For Discount !

24 Hours Online Service

Provide You With Free Industry Solutions

Quality Assurance

%{tishi_zhanwei}%